Posted on

Flooring Facelift

Almost 2 years ago at YHGInverness, we did some major work in the school. We took down a wall and put new flooring down to make the training space bigger and level out the floors.

Original school layout with temporary mats for flooring.
Original school layout with temporary mats for flooring.
School after wall had been taken down and new suspended flooring laid down.
School after wall had been taken down and new suspended flooring laid down.

 

 

 

 

 

 

 

 

 

 

From the above photos you can see the changes that we made.

We recently gave the flooring another facelift, just to spruce it up a bit. you can see from the following photos how they have been transformed.

We are very proud of the finished result. It makes the training space look a lot more spacious and better to train on too. 🙂